Location | Submitted Petition Date | Traffic Study Results | Project Type | Status |
Woodland Dr: Paseo Del Flag to Noelle Ln | 2/2015 | Met thresholds for speeds and or volumes | Traffic circles | Construction pending |
University Ave: Tombaugh Way to Woody Way | 5/2015 | Met thresholds for speeds and or volumes | Traffic circles and curb extensions | Construction pending |
Mt Pleasant: Butler Ave to Edgewood St | 9/2020 | Met thresholds for speeds and or volumes | Advisory Bike Lanes | Install pending |
Country Club: Seminole Dr to Scioto Rd | 10/2020 | Met thresholds for speeds and or volumes | Design phase | Design phase |
Lockett: Fourth St to Fanning | 1/2021 | Met thresholds for speeds and or volumes | Design phase | Design phase |
Linda Vista Dr: Grandview Dr to Fourth St | 6/2021 | Met thresholds for speeds and or volumes | Radar feedback signs | Construction Phase |
Fremont Blvd: Fort Valley Rd to Peak View St | 6/2021 | Met thresholds for speeds and or volumes | Design phase | Design phase |
Sparrow Ave: Mustang Wy to Foxglenn St | 11/2022 | Met thresholds for speeds and or volumes | Study phase | Study phase |
Foxglenn St: Fox Lair Dr to Butler Ave | 4/2023 | Traffic study results pending | Traffic study results pending | Traffic study results pending |